Photo: Borealis supported the programme financially as well as through providing high quality BorSafe™ HDPE100 material for the production of the water infrastructure pipes.
© WSUP / Stand Up Media. image. 2.42mbphoto: In total, around 35-40 km pipe network will be installed, providing approximately 25,000 people with reliable, safe drinking water supply.
© WSUP / Stand Up Media. image. 2.45mbphoto: Borealis supported the programme financially as well as through providing high quality BorSafe™ HDPE100 material for the production of the water infrastructure pipes.
© WSUP. image. 2.49mbphoto: The installation of the BorSafe™ HDPE100 water pipes have progressed and a major water tower and its waterworks are also being rehabilitated.
© WSUP / Stand Up Media. image. 2.5mb